Difference between revisions of "Assessment and Evaluation"

From Digital Scholarship Group
Jump to navigation Jump to search
(Created page with "test")
 
Line 1: Line 1:
test
+
==What does the library already collect pertinent to the DSG?==
 +
 
 +
* Numbers of items digitized (currently largely collected from Archives)
 +
* Workshops given, number of attendees (how would DSG vs. DSC discussions count here?)
 +
* Hours spent in consultation with faculty/grad
 +
 
 +
==How does the DSG define success?==
 +
 
 +
Project success: How long does a project retain staff? When does a project start to maintain its own documentation? When does a project apply for and receive its own funding?
 +
 
 +
DSG technology impact: When are new structures and programs developed? When is DSG code re-used?
 +
 
 +
Graduate student development: How many conference presentations and posters are given by DSG grad students, related to DSG projects? How many workshops are designed and led by grad students?
 +
 
 +
DRS impact: How may new users? Deposits? Downloads? DRS has enabled how many projects?

Revision as of 11:04, 18 December 2014

What does the library already collect pertinent to the DSG?

  • Numbers of items digitized (currently largely collected from Archives)
  • Workshops given, number of attendees (how would DSG vs. DSC discussions count here?)
  • Hours spent in consultation with faculty/grad

How does the DSG define success?

Project success: How long does a project retain staff? When does a project start to maintain its own documentation? When does a project apply for and receive its own funding?

DSG technology impact: When are new structures and programs developed? When is DSG code re-used?

Graduate student development: How many conference presentations and posters are given by DSG grad students, related to DSG projects? How many workshops are designed and led by grad students?

DRS impact: How may new users? Deposits? Downloads? DRS has enabled how many projects?