Difference between revisions of "DSG DRS Pilot Project Workflow"

From Digital Scholarship Group
Jump to navigation Jump to search
Line 12: Line 12:
 
==WordPress Integration==
 
==WordPress Integration==
 
==WordPress / HTML Review==
 
==WordPress / HTML Review==
 +
*Quality Assurance / Troubleshoots (David and Abbie)
 +
*DSG Review of Code (Eli and David)
 +
 
==Documentation (Files and Links)==
 
==Documentation (Files and Links)==
  

Revision as of 11:48, 14 July 2015

Introduction

-content outlined in DRS Project Toolkit CFP

Preliminary Meetings

  • Attendees: Sarah, Amanda, Jim (DSG), project stakeholders, library liaison(s)
  • Agenda: Introduce DRS to projects, get more information about project scope and intentions, discuss location of project data and state of data (digitized, not digitized, format, etc.), delegate points of contact between project and DSG (Jim / Coordinator on DSG end, Project contact determined by project), discuss next steps involved in Content Review for project and DSG, email summary of meeting.

File Preparation

Training and Instruction

File Ingestion

WordPress Integration

WordPress / HTML Review

  • Quality Assurance / Troubleshoots (David and Abbie)
  • DSG Review of Code (Eli and David)

Documentation (Files and Links)

  • Development Work: plugin, themes, customization.

Plugin: adds functionality (search, browse) Theme: how the content (facets, display settings, context) is presented Time Frame: Early July

  • File Preparation: materials, metadata, file support (Sarah and Project)
  • Content Review: copyright issues (Project, Hillary, and Amanda)
  • Documentation (Jim, Julia, Sarah, Amanda)
  • Training / Instruction of Project Team (Sarah, Jim)
  • File Ingestation (Sarah, Dev Team)
  • Contextual Content Creation: static text for curation (Project, Jim, Sarah, Amanda, Dave DeCamp)
  • DRS Content Integration (Project)
  • Quality Assurance (QA) and Troubleshooting (Project, Dave, and Jim)
  • DSG Review of Code (Development Team)
  • Process Documentation (Jim, Ashley, and Linda) — DSG doc, e.g. DRS Tookkit, on our wiki; projects’ processes on their GitHub repository wiki (if they have a GitHub repository)
  • Outreach / Visibility (Jim, Amanda, Julia)
  • Feature Tracking / Second Wave Development: maintenance, updates (Development Team)
  • Project Management: onboarding and management (Jim)