Difference between revisions of "DSG DRS Pilot Project Workflow"
Jump to navigation
Jump to search
m (add some notes from meeting) |
m |
||
Line 1: | Line 1: | ||
− | + | ||
+ | == Introduction== | ||
+ | |||
+ | == Preliminary Meetings== | ||
+ | ==File Preparation== | ||
+ | ==Training and Instruction== | ||
+ | ==File Ingestion== | ||
+ | ==WordPress Integration== | ||
+ | ==WordPress / HTML Review== | ||
+ | ==Documentation (Files and Links)== | ||
+ | |||
*Development Work: plugin, themes, customization. | *Development Work: plugin, themes, customization. |
Revision as of 12:51, 11 May 2015
Introduction
Preliminary Meetings
File Preparation
Training and Instruction
File Ingestion
WordPress Integration
WordPress / HTML Review
Documentation (Files and Links)
- Development Work: plugin, themes, customization.
Plugin: adds functionality (search, browse) Theme: how the content (facets, display settings, context) is presented Time Frame: Early July
- File Preparation: materials, metadata, file support (Sarah and Project)
- Content Review: copyright issues (Project, Hillary, and Amanda)
- Documentation (Jim, Julia, Sarah, Amanda)
- Training / Instruction of Project Team (Sarah, Jim)
- File Ingestation (Sarah, Dev Team)
- Contextual Content Creation: static text for curation (Project, Jim, Sarah, Amanda, Dave DeCamp)
- DRS Content Integration (Project)
- Quality Assurance (QA) and Troubleshooting (Project, Dave, and Jim)
- DSG Review of Code (Development Team)
- Process Documentation (Jim, Ashley, and Linda) — DSG doc, e.g. DRS Tookkit, on our wiki; projects’ processes on their GitHub repository wiki (if they have a GitHub repository)
- Outreach / Visibility (Jim, Amanda, Julia)
- Feature Tracking / Second Wave Development: maintenance, updates (Development Team)
- Project Management: onboarding and management (Jim)